top of page

LEKI-QEBELE RAILWAY PROJECT, AZERBAIJAN

Azerbaijan State Railways preferred Ulusoy Rail Systems' Over Head Line Equipments and Catenary Systems in the construction stage of electrification works of Leki-Qebele railway project.

 

The railway, which will start operating in June 2020, is suitable at a speed of 160 km / h per hour with sufficient infrastructure for high speed trains.

  • Linkedin

Ulusoy Raylı Sistemler A.Ş

1. OSB OÄŸuz Cad. No: 37/1  06935 Sincan - Ankara / Türkiye

(+90) 312 267 50 20

Ulusoy Railway Systems UK Ltd

Aston House,Cornwall Avenue, LondonUnited Kingdom N3 1LF

(+44) 7717 337855

Ulusoy Rayslı Sistemler A.Ş, Ulusoy Railway Systems, URS

Copyright © 2023 Tüm Hakları Saklıdır

bottom of page